Hardware & Bolt Management

https://www.youtube.com/watch?v=8bO5eE8qI_8

Hardware & Bolt Management

Bolt through hold + 4–5 full threads in T-nut. Too short strips; too long bottoms out and feels tight but is loose.

Sort bolts; separate damaged; lonestars need set screws.

Practical assignment (DO)

Photo: three holds with correct bolt length + caption why.